| 000 | 00946cab a2200181 4500 | ||
|---|---|---|---|
| 001 | ##L132812 | ||
| 008 | 060310n2006 000 0 eng u | ||
| 035 | _a(Sirsi) u132812 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aJones, Kevin | |
| 245 | 0 | 0 | _aLook after your assets and your assets will look after you |
| 260 | _c2006 | ||
| 490 | 0 |
_aBuilding Engineer _vMarch 2006, 24-25(2) |
|
| 520 | _aArgues that the full costs of capital equipment such as electrical distribution, automation and control equipment are often overlooked, despite the fact that operating costs can dwarf the initial capital cost. A strategy to help mitigate these problems involves choosing the right equipment at the outset, ensuring that the system itself is robust, having proper maintenance arrangements in place, and reviewing and, if necessary, upgrading the equipment from time to time. | ||
| 590 | _aIKA140306 | ||
| 690 | _aMANAGEMENT-FACILITIES MANAGEMENT | ||
| 942 | _n0 | ||
| 999 |
_c76644 _d76644 |
||