| 245 | 0 | 0 | _aDates are key in the New Engineering Contract |
| 260 | _c2006 | ||
| 490 | 0 |
_aContract Journal _v432(6566) 15 March 2006, 42(1) |
|
| 520 | _aAdvises on the selection of appropriate procurement options in the third edition of the NEC, and then looks at the introduction of key dates which allow the employer to identify conditions that have to be met by specified times, and the costs recoverable if a contractor fails to achieve these. | ||