000 00679cab a2200181 4500
001 ##L133376
008 060504n2006 000 0 eng u
035 _a(Sirsi) u133376
041 0 _aeng
100 1 _aKalita, Neal
245 0 0 _aCost model
_binfrastructure
260 _c2006
490 0 _aBuilding
_v271(8428) 28 April 2006, 60-65(6)
520 _aExamines the design considerations, procurement issues, financial risks and sustainability of infrastructure works on a mixed-use scheme located on a brownfield site. Also gives indicative rates for civils and services infrastructure.
590 _aIKA090506
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c76964
_d76964