000 00824cab a2200193 4500
001 ##L135555
008 061107n2006 000 0 eng u
035 _a(Sirsi) u135555
041 0 _aeng
100 1 _aGrandorge, David
245 0 0 _aBuilding study
_bthey have been brave in making the building address the street rather than hide behind a fence
260 _c2006
490 0 _aArchitects' Journal
_v224(16) 2 November 2006, 24-35(9)
520 _aReports on the design, architecture and costing of the Tolladine Sure Start and Community Centre, Worcester. Contains building costs (gross external floor area), architects' drawings, layout plans and project credits. The total cost was £535 277.
590 _aIKA141106
651 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c77935
_d77935