| 000 | 00824cab a2200193 4500 | ||
|---|---|---|---|
| 001 | ##L135555 | ||
| 008 | 061107n2006 000 0 eng u | ||
| 035 | _a(Sirsi) u135555 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aGrandorge, David | |
| 245 | 0 | 0 |
_aBuilding study _bthey have been brave in making the building address the street rather than hide behind a fence |
| 260 | _c2006 | ||
| 490 | 0 |
_aArchitects' Journal _v224(16) 2 November 2006, 24-35(9) |
|
| 520 | _aReports on the design, architecture and costing of the Tolladine Sure Start and Community Centre, Worcester. Contains building costs (gross external floor area), architects' drawings, layout plans and project credits. The total cost was £535 277. | ||
| 590 | _aIKA141106 | ||
| 651 |
_aUnited Kingdom _y |
||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c77935 _d77935 |
||