| 245 | 0 | 0 | _aCompetitive gap crushes concrete |
| 260 | _c2007 | ||
| 490 | 0 |
_aNew Steel Construction _v15(1) January 2007, 17(1) |
|
| 520 | _aThe latest "Cost comparison survey" by Corus confirms steel as the preferred option for framing, in terms of cost and speed of construction. For office buildings, steel is on average £33 per sq m cheaper for frames and floors than concrete and for the whole building steel is £55 per sq m cheaper. For residential buildings, the whole building is 3% cheaper in steel than in concrete. | ||