000 00724cab a22001935a 4500
001 L137921
008 070508e20070426xxk f 000 0 eng d
035 _a(Sirsi) u137921
041 0 _aeng
100 1 _aDunlop, Alan
245 0 0 _aBuilding study
_bthe colours are cheery but the materials are hard
260 _c2007
490 0 _aArchitects' Journal
_v225(16) 26 April 2007, 24-35(12)
520 _aReports on the design, architecture and costing of the Richard Desmond Children?s Eye Centre, London. Contains building costs, layout plans, working details and project credits. The total cost was £11.9m.
590 _aKA
651 4 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
999 _c78737
_d78737