| 000 | 01117cab a22001935a 4500 | ||
|---|---|---|---|
| 001 | L138623 | ||
| 008 | 070627e20070622xxk f 000 0 eng d | ||
| 035 | _a(Sirsi) u138623 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aKing, Alistair | |
| 245 | 0 | 0 | _aMight as well try and catch the wind |
| 260 | _c2007 | ||
| 490 |
_aBuilding Magazine _v(25) 22 June 2007, 50-51(2) |
||
| 520 | _aDescribes the technology and issues surrounding domestic wind turbines. Describes the two basic types of micro-turbine and factors affecting their operation. Average wind speed values can be obtained for UK postcodes. First obtaining full wind and acoustic surveys of the area is a desirable step, but can double the overall installation cost. Some experts suggest that homeowners may have to wait 30 years to reach break-even point for a 1kW turbine. Planning permission can be difficult to obtain, although there are plans to relax this. Government grants of up to £2 500 can be obtained by householders. | ||
| 590 | _aKA | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aENVIRONMENTAL AND LAND CONSULTANCY-ENERGY-RENEWABLE ENERGY | ||
| 942 | _n0 | ||
| 999 |
_c78930 _d78930 |
||