| 000 | 00815cab a22001935a 4500 | ||
|---|---|---|---|
| 001 | L141722 | ||
| 008 | 071217e20071207xxkd f s 000 0 eng d | ||
| 035 | _a(Sirsi) u141722 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aFordham, Peter | |
| 245 | 0 | 0 | _aCost update |
| 260 | _c2007 | ||
| 490 |
_aBuilding _v272(8509) 7 December 2007, 62-64(3) |
||
| 520 | _aReports that increases in materials prices are easing in the second half of 2007, although there is still strong demand for timber and steel. The building cost index indicates that inflation remains above 5%, although the index has been gradually dropping over the past year. While construction wages have increased, they remain below the national average. | ||
| 590 | _aKA | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 999 |
_c79573 _d79573 |
||