000 00856cab a22002055a 4500
001 L142648
008 080226e20080222xxk f 000 0 eng d
035 _a(Sirsi) u142648
041 0 _aeng
100 1 _aRawlinson, Simon
245 0 0 _aCost model
_blaboratories
260 _c2008
490 0 _aBuilding
_v273(8517) 22 February 2008, 68-75(8)
520 _aLooks at the key issues and costing involved in the construction of laboratories. Outlines key design issues, the practical planning of laboratory facilities, servicing strategies for laboratories, sustainability, and cost drivers. The cost model breakdown is based on a university-funded research laboratory, with a gross floor area of 12 600m2.
590 _aKA
651 4 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING COSTS
710 2 _aDavis Langdon
_94649
942 _n0
999 _c79891
_d79891