| 000 | 01197cab a22002295a 4500 | ||
|---|---|---|---|
| 001 | L144783 | ||
| 008 | 080811e20080725xxkd f s 000 0 eng d | ||
| 035 | _a(Sirsi) u144783 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aFordham, Peter | |
| 245 | 0 | 0 |
_aMarket forecast _bcut-throat times |
| 260 | _c2008 | ||
| 490 | 0 |
_aBuilding _v273(8539) 25 July 2008, 64-66(3) |
|
| 520 | _aDavis Langdon's Tender Price Index reveals a continued increase in building prices in Greater London in the second quarter of 2008. Prices are expected to rise 3-5% in the next year, although regions outside Greater London could show lower rates of inflation. The Building Cost Index increased by 4.4% over the year to the second quarter of 2008, and the rate of interest in the Retail Prices Index rose back to 4.4%. Contains general trends and forecasts for the construction industry, including materials prices and market characteristics. Provides a report on the economy and the credit crunch. | ||
| 590 | _aKA | ||
| 650 | 2 | 4 | _aDAVIS LANGDON TENDER PRICE INDEX |
| 650 | 2 | 4 | _aBUILDING COST INDEX |
| 650 | 2 | 4 | _aCREDIT CRUNCH |
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION MARKET | ||
| 942 | _n0 | ||
| 999 |
_c80584 _d80584 |
||