000 01074cab a22002055a 4500
001 L145921
008 081121s2008 xxk f 000 0 eng d
035 _a(Sirsi) u145921
041 0 _aeng
100 1 _aPackham, Mike
245 0 4 _aThe complete picture
_h[electronic resource]
260 _aLondon
_bRedactivepublishing
_c2008
490 _aFM World
_vOctober 2008
520 _aIn the second of a three part series on life-cycle costing, looks at the types and sources of information required in the process of whole-life/life-cycle costing. Considers calculating costs and operational costs, highlighting the pitfalls involved. Explains how to apply the present value factor and provides life-cycle formulas. (See also L145920 and L145922).
590 _aKA
651 4 _aUnited Kingdom
_y
690 _aMANAGEMENT-BUSINESS MANAGEMENT-COST MANAGEMENT-COST ANALYSIS-LIFE CYCLE COSTING
856 4 0 _uhttps://www.fm-world.co.uk/features/feature-articles/the-complete-picture/?locale=en
_zSubscription and/or membership is required, see www.fm-world.co.uk
942 _n0
999 _c80979
_d80979