| 245 | _aPredicting medium term cost escalation | ||
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding Economist _vMarch 1996, 8-10(3) |
||
| 520 | _aConsiders factors to be taken into consideration by the estimator when attempting to predict the amount of escalation in cost between the estimate preparation and the bid date. Covers tools such as the Labour and Materials Index (LMI), construction cycles and Tender Index. Case study. References. | ||