| 000 | 00825cab a22001935a 4500 | ||
|---|---|---|---|
| 001 | L148465 | ||
| 008 | 090922e20090521xxk f 000 0 eng d | ||
| 035 | _a(Sirsi) u148465 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aWhitten, Nick | |
| 245 | 0 | 0 | _aCostain joins top table after bumper month |
| 260 | _c2009 | ||
| 490 |
_aConstruction News _v21 May 2009, 20-25(6) |
||
| 520 | _aLists top contractors and clients in April 2009 and information about the infrastructure sector from latest Glenigan League Tables. Shows that Costain is top of the contractors top five for the past year helped by a £397m deal to design and build municipal waste treatment infrastructure for Greater Manchester Waste Disposal Authority. | ||
| 590 | _aKA | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION MARKET | ||
| 942 | _n0 | ||
| 999 |
_c81854 _d81854 |
||