000 00637cab a2200217 4500
001 ABS54884
008 090401t1996 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u12777
041 _aeng
100 _aNorton, B.
245 2 _aA healthy change of emphasis
260 _c1996
350 _a0
490 _aContract Journal
_v383(6072) 25 April 1996, 32-33(2)
520 _aConsiders the effect the CDM regulations have had for contractors.
650 _aCONSTRUCTION (DESIGN AND MANAGEMENT) REGULATIONS 1994
650 _aCONTRACTORS
690 _aBUILDING AND CONSTRUCTION-REGULATIONS
942 _n0
948 _c04/03/1997
999 _c8186
_d8186