| 000 | 00766cab a22001935a 4500 | ||
|---|---|---|---|
| 001 | L149495 | ||
| 008 | 100309e20100205xxkd f 000 0 eng d | ||
| 035 | _a(Sirsi) u149495 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aMoone, Brian | |
| 245 | 0 | 0 |
_aLead times _bJuly-September 2009 |
| 260 | _c2010 | ||
| 490 | 0 |
_aBuilding _v275 (8615) 5 February 2010, 52-53 (2) |
|
| 520 | _aGives lead times for various products including piling, curtain walling and drylining. Many of the products have stayed level during this period but some including structural steel frames and concrete works have fallen. Once again none of the products have increased their lead times. | ||
| 590 | _aKA | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS | ||
| 942 | _n0 | ||
| 999 |
_c82189 _d82189 |
||