000 01433cab a22002055a 4500
001 E151984
008 110118e20100129xxk 000 0 eng d
035 _a(Sirsi) u151984
041 0 _aeng
245 0 0 _aBanner Holdings Limited v Colchester Borough Council
_h[electronic resource]
260 _c2010
520 _a[2010] EWHC 139 (TCC) 29 January 2010. Considers whether a condition of the contract between B (claimant) and C (defendant) expressly provided that an adjudicator appointed under the contract had no jurisdiction to change any decision made by C, as employer, in respect of determination. Also considers whether, if this is the case, the express terms of the contract do not comply with the Housing Grants Construction and Regeneration Act 1996 S108 and therefore must be replaced by part, or all, of the Scheme for Construction Contracts, SI 1998:649. "Held": the adjudicator does have the necessary jurisdiction to decide the dispute that has been referred to him.
590 _aKA
650 2 4 _aBANNER HOLDINGS LTD V COLCHESTER BC
651 4 _aEngland and Wales
_y1543-
690 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
690 _aMANAGEMENT-DISPUTE AVOIDANCE, MANAGEMENT AND RESOLUTION-DISPUTE MANAGEMENT AND RESOLUTION-ALTERNATIVE DISPUTE RESOLUTION-ADJUDICATION
856 4 0 _uhttps://www.bailii.org/ew/cases/EWHC/TCC/2010/139.html
_zView the case free of charge at www.bailii.org
942 _n0
999 _c82876
_d82876