| 000 | 00937cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS38873 | ||
| 008 | 090401t1988 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u12963 | ||
| 041 | _aeng | ||
| 245 | _aSick office - off sick | ||
| 260 | _c1988 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v253(7538) 11 March 1988, 66-67(2) |
||
| 520 | _aReports on the findings of the second phase of the largest survey ever conducted in the UK into sick building syndrome . The second phase of the survey carried out by Building Use Studies involved returning to the buildings found to have the highest rate of complaint in the first study. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING ELEMENTS-COMPLETE BUILDING SERVICES ELEMENTS-COMPLETE HEATING, VENTILATION AND AIR CONDITIONING SYSTEMS | ||
| 650 |
_aBlock management _96220 |
||
| 650 | _aOFFICES | ||
| 650 | _aVENTILATION | ||
| 690 | _aBUILT ENVIRONMENT | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c8326 _d8326 |
||