000 00738cab a2200217 4500
001 ABS38885
008 090401t1988 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u13066
041 _aeng
100 _aSpring, M.
245 2 _aA healthy rush of blood
260 _c1988
350 _a0
490 _aBuilding
_v253(7539) 18 March 1988, 43-47(5)
520 _aDescribes how management contracting and fast-track construction were successfully combined to build the North London Blood Transfusion Centre in just two years and five months, half the time of a standard NHS project.
650 _aBUILDING PROJECTS
650 _aHOSPITALS
690 _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN
942 _n0
948 _c04/03/1997
999 _c8398
_d8398