| 000 | 00613cab a22002055a 4500 | ||
|---|---|---|---|
| 001 | L156693 | ||
| 008 | 120626e20120217xxk 000 0 eng d | ||
| 035 | _a(Sirsi) u156693 | ||
| 041 | 0 | _aeng | |
| 100 | 1 | _aAddy, Nigel | |
| 245 | 0 | 0 |
_aCost model _boffice refurbishments |
| 260 | _c2012 | ||
| 490 |
_aBuilding _v277 (8733) 22 June 2012, 48-53(6) |
||
| 520 | _aCovers introduction, adding value through refurbishment, base building, sustainability, cost ranges, and cost models. | ||
| 590 | _aKA | ||
| 651 | 4 |
_aUnited Kingdom _y |
|
| 690 |
_aCost management _96233 |
||
| 700 | 1 | _aMcCallum, Peter | |
| 942 | _n0 | ||
| 999 |
_c84122 _d84122 |
||