| 000 | 00409cam a2200169 4500 | ||
|---|---|---|---|
| 001 | D10393 | ||
| 008 | 090401t xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u19017 | ||
| 041 | _aeng | ||
| 100 | _aChelmick, D.G. | ||
| 245 | _aElemental cost planning | ||
| 350 | _a0 | ||
| 520 | _aIn RICS. Cost control of building services. 1980/6 A. | ||
| 700 | _aEdworthy, G.A. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c87644 _d87644 |
||