000 01158cam a2200301 4500
008 090401t1993 xxu||||| |||| 00| 0 eng d
020 _a0906182735
022 _a0950-3250
035 _a(Sirsi) u20315
041 _aeng
050 _a692.5
090 _aRICS 1993/91A
110 _aBuilding Cost Information Service
_91096
245 _aBCIS guide to daywork rates
_bcalculations of standard hourly base rates for labour.
250 _a8th ed.
260 _aKingston Upon Thames
_bBCIS
_c1993
300 _a49p.
_c30cm.
350 _a17.5
520 _aAnnual guide to daywork rates which gives model calculations of standard hourly base rates, including all 1992 wage awards. Includes rates from 1983 to date.
520 _aThis item is part of a subscription service and cannot be photocopied. Neither can any part of it be read out over the phone. Please contact BCIS direct for more details t +44 (0)20 7695 1500.
650 _aBUILT ENVIRONMENT-BUILDING COSTS
650 _aDAYWORK RATES
650 _aLABOUR COSTS
650 _aLABOUR RATES
690 _aBUILT ENVIRONMENT-BUILDING COSTS
942 _n0
948 _c04/03/1997
999 _c87795
_d87795