| 000 | 00562cam a2200205 4500 | ||
|---|---|---|---|
| 001 | D15278 | ||
| 008 | 090401t1963 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u21645 | ||
| 041 | _aeng | ||
| 050 | _a690.028 | ||
| 110 |
_aRoyal Institution of Chartered Surveyors _94900 |
||
| 245 | 4 | _aThe cost implications of mechanical plant and their influence on the design of buildings | |
| 260 |
_bRICS _c1963 |
||
| 300 | _a111p | ||
| 350 | _a0 | ||
| 520 | _aFiled in box 1963/33 AB | ||
| 710 |
_aCost Research Panel _9912 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c88025 _d88025 |
||