000 01127cam a2200277 4500
001 ##D15294
008 1975
020 _a0854060596
035 _a(Sirsi) u21735
041 0 _aeng
050 0 4 _a692.8 $2 18
090 _a1975/22ABCD
110 2 _aRoyal Institution of Chartered Surveyors
_94900
245 0 0 _aDefinition of prime cost of daywork carried out under a building contract.
250 _a2nd
260 _aLondon
_bRICS
_c1975
300 _a8p.
_c21cm
350 _a0.50
520 _aBecame operative on 1 December 1975. (See also Chartered Quantity Surveyor 1(5) May 1979, 55 for an updated version of the example printed on p8 of the definition of the calculation of the standard hourly base rate as defined in section three for a typical building craft operative and labour in NJCBI Grade A areas as at 1 January 1979).
520 _aSuperseded by third edition (L138499).
651 4 _aUnited Kingdom
_y
690 _aBUILT ENVIRONMENT-BUILDING COSTS
710 2 _aNational Federation of Building Trades Employers
_91526
942 _n0
948 _c04/03/1997
999 _c88045
_d88045