| 000 | 00737cam a2200217 4500 | ||
|---|---|---|---|
| 001 | D15461 | ||
| 008 | 090401t1979 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u23001 | ||
| 041 | _aeng | ||
| 050 | _a690.23 | ||
| 090 | _aRICS 1979/53ABC | ||
| 110 |
_aRoyal Institution of Chartered Surveyors _94900 |
||
| 245 | _aGuide to house rebuilding costs for insurance valuation, prepared on behalf of the British Insurance Association by the Building Cost Information Service of the Royal Institution of Chartered Surveyors | ||
| 250 | _a2nd | ||
| 260 |
_bRICS _c1979 |
||
| 300 | _a43p. 30cm | ||
| 350 | _a2.5 | ||
| 520 | _aFiled in box 1979/53 ABC; (Contains costs as at 30th September 1979) | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c88296 _d88296 |
||