000 00630cab a2200229 4500
001 ABS55064
008 090401t1996 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u13918
041 _aeng
100 _aZafar, Z.Q.
245 _aConstruction project delay analysis
260 _c1996
350 _a0
490 _aCost Engineering
_v38(3) March 1996, 23-27(5)
520 _aOutlines the procedure for analysing why and how a project came to be delayed.
650 _aCRITICAL PATH METHOD
650 _aDELAY ANALYSIS
650 _aDELAYS
690 _aProject management
_96261
942 _n0
948 _c04/03/1997
999 _c8991
_d8991