| 000 | 00630cab a2200229 4500 | ||
|---|---|---|---|
| 001 | ABS55064 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u13918 | ||
| 041 | _aeng | ||
| 100 | _aZafar, Z.Q. | ||
| 245 | _aConstruction project delay analysis | ||
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aCost Engineering _v38(3) March 1996, 23-27(5) |
||
| 520 | _aOutlines the procedure for analysing why and how a project came to be delayed. | ||
| 650 | _aCRITICAL PATH METHOD | ||
| 650 | _aDELAY ANALYSIS | ||
| 650 | _aDELAYS | ||
| 690 |
_aProject management _96261 |
||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c8991 _d8991 |
||