| 000 | 00887cam a2200301 4500 | ||
|---|---|---|---|
| 001 | M1916 | ||
| 008 | 090401t1995 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u35251 | ||
| 041 | _aeng | ||
| 050 | _a658.1552 | ||
| 090 | _aRICS 1995/61A | ||
| 110 |
_aRoyal Institution of Chartered Surveyors _94900 |
||
| 245 | _aImproving value for money in construction: guidance for chartered surveyors and their clients: summary of the report. | ||
| 260 |
_aLondon _bRICS _c1995 |
||
| 300 | _a1 folded sheet ; 30cm. | ||
| 350 | _a0 | ||
| 520 | _aSummary of the report. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 | _aCONSTRUCTION INDUSTRY | ||
| 650 | _aCOST REDUCTION | ||
| 650 | _aCOST SAVINGS | ||
| 650 | _aPERFORMANCE | ||
| 650 | _aREDUCTION | ||
| 650 | _aVALUE FOR MONEY | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c90076 _d90076 |
||