000 01312cab a2200313 4500
001 WB2740-47
008 090401t1991 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u13989
041 _aeng
245 _aDevelopment study for East Thames corridor
260 _c1991
350 _a0
490 _aDoE News Release
_v(610) 10 October 1991
490 _aDaily Telegraph
_v11 October 1991, 2
490 _aTimes
_v11 October 1991, 1
490 _aFinancial Times
_v11 October 1991, 8
490 _aPlanning (for the Natural and Built Environment)
_v(939) 11 October 1991, 1
490 _aBuilding Design
_v(1052) 11 october 1991, 24
490 _aGuardian
_v12 October 1991, 3(8)
520 _aAssesses the impact for development along the East Thames route following the decision to take the Channel Tunnel high speed rail link via Stratford East. DOE is commissioning a study to look at development in the Lower . Thames area. A proposed development of a private power station together with 6500 new homes in Dagenham is threatened by the East London route.
650 _aCHANNEL TUNNEL RAIL LINK
650 _aEAST THAMES CORRIDOR
650 _aMEDWAY TOWNS
650 _aSERPLAN
690 _aPROPERTY-PROPERTY DEVELOPMENT
690 _aURBAN RENEWAL
942 _n0
948 _c04/03/1997
999 _c9053
_d9053