000 00847cab a2200205 4500
001 ABS51186
008 090401t1994 xxu||||| |||| 00| 0 eng d
035 _a(Sirsi) u14182
041 _aeng
100 _aBrewer, G.
245 _aTwixt the safety net and the trapeze
260 _c1994
350 _a0
490 _aContract Journal
_v374(5989) 25 August 1994, 12-13(2)
520 _aLooks at the debate over the need to reform arbitration procedures, commenting on the draft arbitration bill published by the DTI, which, the author does not think will solve the main problem; that of the slow and costly nature of arbitration.
650 _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS
690 _aMANAGEMENT-DISPUTE AVOIDANCE, MANAGEMENT AND RESOLUTION-DISPUTE MANAGEMENT AND RESOLUTION-ARBITRATION
942 _n0
948 _c04/03/1997
999 _c9210
_d9210