| 000 | 00847cab a2200205 4500 | ||
|---|---|---|---|
| 001 | ABS51186 | ||
| 008 | 090401t1994 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u14182 | ||
| 041 | _aeng | ||
| 100 | _aBrewer, G. | ||
| 245 | _aTwixt the safety net and the trapeze | ||
| 260 | _c1994 | ||
| 350 | _a0 | ||
| 490 |
_aContract Journal _v374(5989) 25 August 1994, 12-13(2) |
||
| 520 | _aLooks at the debate over the need to reform arbitration procedures, commenting on the draft arbitration bill published by the DTI, which, the author does not think will solve the main problem; that of the slow and costly nature of arbitration. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 690 | _aMANAGEMENT-DISPUTE AVOIDANCE, MANAGEMENT AND RESOLUTION-DISPUTE MANAGEMENT AND RESOLUTION-ARBITRATION | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c9210 _d9210 |
||