| 000 | 00879cab a2200253 4500 | ||
|---|---|---|---|
| 001 | ABS55109 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u14274 | ||
| 041 | _aeng | ||
| 100 | _aChevin, D. | ||
| 245 | 4 | _aThe Max factor | |
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aBuilding _v161(20) 17 May 1996, 40-42(2) |
||
| 520 | _aEvaluates the pros and cons of maximum price guarantees in the construction industry. Discusses if such guarantees actually work better as a measure against rising costs than the traditional construction management philosophy. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 650 |
_aCONSTRUCTION MANAGEMENT _96230 |
||
| 650 | _aCONSTRUCTION PROCUREMENT | ||
| 650 | _aGUARANTEED MAXIMUM PRICES | ||
| 650 | _aPRICE GUARANTEES | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING COSTS | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c9278 _d9278 |
||