| 000 | 00860cab a2200277 4500 | ||
|---|---|---|---|
| 001 | ABS55113 | ||
| 008 | 090401t1996 xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u14300 | ||
| 041 | _aeng | ||
| 100 | _aEvans, B. | ||
| 245 | _aPassive ideas cast in concrete | ||
| 260 | _c1996 | ||
| 350 | _a0 | ||
| 490 |
_aArchitects` Journal _v203(20) 23 May 1996, 51-53(3) |
||
| 520 | _aReports on BRE`s latest low-energy office under construction at Watford. Reflects on its prototypical design,and energy efficiency. | ||
| 650 | _aBUILT ENVIRONMENT-BUILDING MATERIALS | ||
| 650 | _aENERGY EFFICIENT BUILDINGS | ||
| 650 | _aLOW-ENERGY OFFICES | ||
| 650 | _aOFFICE BUILDINGS | ||
| 650 | _aPASSIVE DESIGN | ||
| 650 | _aRECYCLED MATERIALS | ||
| 650 | _aRECYCLING | ||
| 690 | _aBUILT ENVIRONMENT-CONSTRUCTION DESIGN | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c9298 _d9298 |
||