| 000 | 01261cam a2200313 4500 | ||
|---|---|---|---|
| 008 | 090401t1999 xxu||||| |||| 00| 0 eng d | ||
| 020 | _a0854069380 | ||
| 022 | _a1354-506X | ||
| 035 | _a(Sirsi) u91426 | ||
| 041 | _aeng | ||
| 050 |
_a624.08 _c18 |
||
| 110 |
_aRoyal Institution of Chartered Surveyors _94900 |
||
| 245 | 2 | _aA critical examination of the designer`s role under the ICE Design and Construct Conditions of Contract and the Highways Agencies Design and Build Conditions of Contract | |
| 260 |
_aLondon _bRICS _c1999 |
||
| 300 |
_aii, 24p. _c30cm. |
||
| 350 | _a7.95 | ||
| 490 |
_aRICS Foundation Research Papers _v3(2) |
||
| 520 | _aResearch indicating that Highways Agency designers have far more responsibility than their ICE counterparts because of the supervisory and certifying role that is demanded by the Agency, whereas the ICE designers need not be site based at all. | ||
| 650 | _aDESIGN AND BUILD CONTRACTS | ||
| 650 | _aDESIGNERS | ||
| 650 | _aENGINEERING CONTRACTS | ||
| 650 | _aHIGHWAYS AGENCY | ||
| 650 | _aICE DESIGN AND CONSTRUCT CONDITIONS OF CONTRACT | ||
| 690 | _aBUILT ENVIRONMENT-BUILDING CONTRACT FORMS | ||
| 700 | _aHodgson, Geoffrey | ||
| 700 | _aJeffrey, J. A. | ||
| 942 | _n0 | ||
| 948 | _c18/02/1999 | ||
| 999 |
_c97637 _d97637 |
||