| 000 | 00408cam a2200169 4500 | ||
|---|---|---|---|
| 001 | D10577 | ||
| 008 | 090401t xxu||||| |||| 00| 0 eng d | ||
| 035 | _a(Sirsi) u95331 | ||
| 041 | _aeng | ||
| 100 | _aEdworthy, G.A. | ||
| 245 | _aElemental cost planning | ||
| 350 | _a0 | ||
| 520 | _aIn RICS. Cost control of building services. 1980/6 A | ||
| 700 | _aChelmick, D.C. | ||
| 942 | _n0 | ||
| 948 | _c04/03/1997 | ||
| 999 |
_c98423 _d98423 |
||