SBCSub/D/C Standard Building Sub-Contract With Sub-Contractor's Design Conditions 2005

By: Language: English Series: JCT Standard Building Subcontract with Subcontractor's Design Conditions (2005 Edition)Publication details: London Sweet and Maxwell 2005Description: iv, 74p 30cmISBN:
  • 0418823707
Uniform titles:
  • SBCSub/D/C 05
Subject(s): LOC classification:
  • 692.8 $2 18
Summary: Subcontract for use where the JCT Standard Building Contract With Approximate Quantities (2005 Edition), JCT Standard Building Contract Without Quantities (2005 Edition) or JCT Building Contract With Quantities (2005 Edition) is the main contract, where the contractor is to design discrete parts of the main contract works and the subcontractor is to design all or part is the subcontract works. May be used for where subcontract works and/or main contract works are to be carried out in sections and for subcontract works that are to be carried out on the basis of an adjusted subcontract sum (adjustment for variations etc) or by complete remeasurement. If no subcontractors design is involved the JCT Standard Building Sub-Contract (2005 Edition) and Standard Building Sub-Contract with Sub-Contractor's Design Conditions should be used.
Holdings
Item type Current library Call number Copy number Status Barcode
Reference material London Boxed set JCT 2005/20 (Browse shelf(Opens below)) 1 Available 30071402

Subcontract for use where the JCT Standard Building Contract With Approximate Quantities (2005 Edition), JCT Standard Building Contract Without Quantities (2005 Edition) or JCT Building Contract With Quantities (2005 Edition) is the main contract, where the contractor is to design discrete parts of the main contract works and the subcontractor is to design all or part is the subcontract works. May be used for where subcontract works and/or main contract works are to be carried out in sections and for subcontract works that are to be carried out on the basis of an adjusted subcontract sum (adjustment for variations etc) or by complete remeasurement. If no subcontractors design is involved the JCT Standard Building Sub-Contract (2005 Edition) and Standard Building Sub-Contract with Sub-Contractor's Design Conditions should be used.