Factors of construction time Construction cost vs. gross floor area [electronic resource]
Language: English Series: COBRA ; 2013Publication details: London RICS 2013ISBN:- 9781783210305
| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Book | Virtual Online | ONLINE PUBLICATION (Browse shelf(Opens below)) | 1 | Available | 158901-2001 |
A paper presented at the COBRA Conference in New Delhi on 10-12 September 2013. Showes a statistically significant relationship between construction time and magnitude of the project, measured by gross floor area, at the level of significance (p-value) of < 0.0001. This variable, when introduced in the model, presumably acts as a proxy for actual construction cost. Construction type did not have a statistically significant relationship with construction time. A prediction model of construction time has been developed based on the results of the study.