Image from Google Jackets

Beaufort House Developments Ltd v Zimmcor

Language: English Series: Construction Industry Law Letter ; (1990) CILL 599(1)Publication details: 1990Subject(s): Summary: CA 26 June 1990. Appeal against HC decision (Abs 42619) by Z against damages awarded to B. Concerned with same form of contract as in Rosehaugh Stanhope (Broadgate Phase 6) plc v Redpath Dorman Long Ltd (Abs). It was held that Z was not to be treated in breach of contract and would have completed with a reasonable extension of time. Appeal allowed.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article ABS43030 (Browse shelf(Opens below)) 1 Available 40059-1001

CA 26 June 1990. Appeal against HC decision (Abs 42619) by Z against damages awarded to B. Concerned with same form of contract as in Rosehaugh Stanhope (Broadgate Phase 6) plc v Redpath Dorman Long Ltd (Abs). It was held that Z was not to be treated in breach of contract and would have completed with a reasonable extension of time. Appeal allowed.