Own goal in extra time

By: Language: English Series: Building ; 270(37) 16 September 2005, 73(1)Publication details: 2005Subject(s): Summary: Considers the varying powers of a contract administrator to grant an extension of time to a contractor under JCT and NEC contracts. Where such an extension is granted in error, it is argued that even if there is no provision in the contract for correction of the error, the administrator, by acting outside the terms of the contract, has not issued a valid extension, and can be compelled to withdraw his decision.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L131502 (Browse shelf(Opens below)) 1 Available 131502-1001

Considers the varying powers of a contract administrator to grant an extension of time to a contractor under JCT and NEC contracts. Where such an extension is granted in error, it is argued that even if there is no provision in the contract for correction of the error, the administrator, by acting outside the terms of the contract, has not issued a valid extension, and can be compelled to withdraw his decision.