How to take calculated risks

By: Language: English Series: Building ; 272(8499) 28 September 2007, 60-61(2)Publication details: 2007Subject(s): Summary: Discusses the risks involved in choosing Construction Management (CM) as a procurement route, and looks at how these can be overcome. Advises the scope of construction management projects should be clearly defined, an independent quantity surveyor should be employed as the strategic cost manager, and the project should not be started too soon. Also looks at damages and concludes that CM should not be chosen without considering how to minimise the risks.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L140605 (Browse shelf(Opens below)) 1 Available 140605-1001

Discusses the risks involved in choosing Construction Management (CM) as a procurement route, and looks at how these can be overcome. Advises the scope of construction management projects should be clearly defined, an independent quantity surveyor should be employed as the strategic cost manager, and the project should not be started too soon. Also looks at damages and concludes that CM should not be chosen without considering how to minimise the risks.