Damages for partial failure of contract

Damages for partial failure of contract - 1995 - Times 3 July 1995, 35(1) .

"Ruxley Electronics and Construction Ltd v Forsyth" HL 29 June 1995. The contractor has not built a swimming pool to the maximum depth specified. However, the owner was entitled to damages for loss of amenity and not the cost of reconstruction.


BREACH OF CONTRACT
DANAGES
LOSS OF AMENITY
SWIMMING POOLS