Image from Google Jackets

Damages for partial failure of contract

Language: English Series: Times ; 3 July 1995, 35(1)Publication details: 1995Subject(s): Summary: "Ruxley Electronics and Construction Ltd v Forsyth" HL 29 June 1995. The contractor has not built a swimming pool to the maximum depth specified. However, the owner was entitled to damages for loss of amenity and not the cost of reconstruction.
Holdings
Item type Current library Call number Copy number Status Barcode
Law report London Journal article WB3126-06 (Browse shelf(Opens below)) 1 Available 22175-1001

"Ruxley Electronics and Construction Ltd v Forsyth" HL 29 June 1995. The contractor has not built a swimming pool to the maximum depth specified. However, the owner was entitled to damages for loss of amenity and not the cost of reconstruction.