The trouble with GMP
Patterson, L.
The trouble with GMP - 1999 - Building 264(8104) 17 September 1999, 84(1) .
Considers the pros and cons of guaranteed maximum price (GMP). States that the price in a GMP contract should be flexible, that it is affected by the specificity of the outline design, and that a GMP is not all-inclusive.
GUARANTEED MAXIMUM PRICE CONTRACTS
The trouble with GMP - 1999 - Building 264(8104) 17 September 1999, 84(1) .
Considers the pros and cons of guaranteed maximum price (GMP). States that the price in a GMP contract should be flexible, that it is affected by the specificity of the outline design, and that a GMP is not all-inclusive.
GUARANTEED MAXIMUM PRICE CONTRACTS