The trouble with GMP
Series: Building ; 264(8104) 17 September 1999, 84(1)Publication details: 1999Subject(s): Summary: Considers the pros and cons of guaranteed maximum price (GMP). States that the price in a GMP contract should be flexible, that it is affected by the specificity of the outline design, and that a GMP is not all-inclusive.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS61320 (Browse shelf(Opens below)) | 1 | Available | 100855-1001 |
Considers the pros and cons of guaranteed maximum price (GMP). States that the price in a GMP contract should be flexible, that it is affected by the specificity of the outline design, and that a GMP is not all-inclusive.