Lead times Oct-Dec 2006
Gale, Tony
Lead times Oct-Dec 2006 - 2007 - Building 272(8467) 16 February 2007, 68-71(4) .
Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.
United Kingdom--
Lead times Oct-Dec 2006 - 2007 - Building 272(8467) 16 February 2007, 68-71(4) .
Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.