Image from Google Jackets

Lead times Oct-Dec 2006

By: Contributor(s): Language: English Series: Building ; 272(8467) 16 February 2007, 68-71(4)Publication details: 2007Subject(s): Summary: Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article L136726 (Browse shelf(Opens below)) 1 Available 136726-1001

Gives details of lead times for various products, including piling, concrete works, structural steel frames, precast concrete frames, cladding and roofing. The quarter to December 2006 has seen a steady increase in demand, although overall lead times have stayed the same or reduced, with the exception of curtain walling and suspended ceilings. A separate article examines archaelogical digs on construction sites.