Offsite needs impetus or progress will stall (Record no. 76302)

MARC details
000 -LEADER
fixed length control field 00893cab a2200157 4500
001 - CONTROL NUMBER
control field ##L131986
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 051220n2005 000 0 eng u
035 ## - SYSTEM CONTROL NUMBER
System control number (Sirsi) u131986
041 0# - LANGUAGE CODE
Language code of text/sound track or separate title eng
245 00 - TITLE STATEMENT
Title Offsite needs impetus or progress will stall
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Date of publication, distribution, etc. 2005
490 #0 - SERIES STATEMENT
Series statement Contract Journal
Volume/sequential designation 431(6552) 23 November 2005, 3(1)
520 ## - SUMMARY, ETC.
Summary, etc. The BSRIA briefing 'Building the Future' predicts that offsite construction will be used on only 10% of projects in 30 years time, contradicting the generally held view in the industry that a much higher figure will be achieved. It argues that better information is required to plan work investment in offsite activities, together with consistent workloads from government, generating repeat orders. At present, offsite construction constitutes 3% of total construction activities.
690 ## - LOCAL SUBJECT ADDED ENTRY--TOPICAL TERM (OCLC, RLIN)
Topical term or geographic name as entry element Construction management
9 (RLIN) 6230
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Suppress in OPAC 0
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Total Checkouts Full call number Barcode Date last seen Copy number Price effective from Koha item type
    Dewey Decimal Classification     London London Journal article 20/12/2005   L131986 131986-1001 06/08/2019 1 06/08/2019 Journal article