Design impact of construction fast-track

By: Contributor(s): Language: English Series: Construction Management & Economics ; 6(3) Autumn 1988, 195-208(14)Publication details: 1988Subject(s): Summary: This paper briefly outlines the differences between the fast-tracking and phased construction management techniques. It illustrates, through a project study, the impact of compressing and overlapping design activities in a fast-track programme in order to expedite project delivery. An in-depth delay analysis is presented to show the impact of fast-track related problems on the construction duration. Finally, based on the project study presented in this paper and in reference to other fast-track projects which have experienced difficulties, recommendations are made for the effective utilization of this accelerated technique. References. (Taken from Journal Abstract)
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS39933 (Browse shelf(Opens below)) 1 Available 20158-1001

This paper briefly outlines the differences between the fast-tracking and phased construction management techniques. It illustrates, through a project study, the impact of compressing and overlapping design activities in a fast-track programme in order to expedite project delivery. An in-depth delay analysis is presented to show the impact of fast-track related problems on the construction duration. Finally, based on the project study presented in this paper and in reference to other fast-track projects which have experienced difficulties, recommendations are made for the effective utilization of this accelerated technique. References. (Taken from Journal Abstract)