East Thames Corridor
Language: English Series: Independent ; 25 March 1993, 1&2 | Times ; 25 March 1993, 6 | RICS Press Release ; (PR63/93) 24 March 1993 | DoE News Release ; (206) 24 March 1993(9)Publication details: (206) 24 March 1993(9)Subject(s): Summary: The SoS for the Environment Michael Howard has announced that the original plans for the East Thames Corridor Scheme have been scaled down to a moderate level of growth. The DoE has also published draft planning guidance for the entire South-East, saying that 855,000 new homes would be needed by 2006.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| News article | London News article | WB2912-55 (Browse shelf(Opens below)) | 1 | Available | 22372-1001 |
Browsing London shelves, Shelving location: News article Close shelf browser (Hides shelf browser)
The SoS for the Environment Michael Howard has announced that the original plans for the East Thames Corridor Scheme have been scaled down to a moderate level of growth. The DoE has also published draft planning guidance for the entire South-East, saying that 855,000 new homes would be needed by 2006.