Image from Google Jackets

Construction contractor`s claims analysis: an integrated system approach

By: Contributor(s): Language: English Series: Building ; Research and Information 19(1) January-February 19Subject(s): Summary: Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.

Introduced here is an integrated computerised system designed to analyse construction contractors claims arising from delays. Categorises the types of delay and the consequent claims, before reviewing the analysis procedure. The computer model designed to replace existing methods is described, with flow diagrams as illustration.