Image from Google Jackets

Damning the Severn?

By: Language: English Series: Surveyor ; 176(5175) 16 January 1992, 10-12(2)Publication details: 1992Subject(s): Summary: The Severn estuary has long been the subject of electricity-generation barrage plans. Most favoured at present is a ten mile dam from Brean Down to Lavernock Point which would generate 7% of Britain`s electricity requirement and up to 35,000 construction jobs, but the cost to the environment, assessed here, could be enormous and requires thorough investigation.
Holdings
Item type Current library Call number Copy number Status Barcode
Journal article London Journal article ABS45717 (Browse shelf(Opens below)) 1 Available 54718-1001

The Severn estuary has long been the subject of electricity-generation barrage plans. Most favoured at present is a ten mile dam from Brean Down to Lavernock Point which would generate 7% of Britain`s electricity requirement and up to 35,000 construction jobs, but the cost to the environment, assessed here, could be enormous and requires thorough investigation.