Total costs and global claims
Language: English Series: International Construction Law Review ; 12(4) October 1995, 531-560(30)Publication details: 1995Subject(s): Summary: Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS53682 (Browse shelf(Opens below)) | 1 | Available | 5876-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Detailed consideration of global claims. Looks at claims for damages for breach of contract and adjustments under contract provisions. Considers the total cost/time assessment claim; its origins and methodology, including the points to note when such a claim is formulated. Refers to various case law in the text.