Times of change
Language: English Series: New Builder ; 23 July 1992, 23(1)Publication details: 1992Subject(s): Summary: Briefly identifies the main procurement methods currently favoured within the UK construction industry including construction management, design and build and traditional contracts such as JCT 1980.| Item type | Current library | Call number | Copy number | Status | Barcode | |
|---|---|---|---|---|---|---|
| Journal article | London Journal article | ABS46689 (Browse shelf(Opens below)) | 1 | Available | 59202-1001 |
Browsing London shelves, Shelving location: Journal article Close shelf browser (Hides shelf browser)
Briefly identifies the main procurement methods currently favoured within the UK construction industry including construction management, design and build and traditional contracts such as JCT 1980.